FREE SHIPPING ON ORDERS OVER $100! | SEE IF YOU QUALIFY FOR A BLASTONE CREDIT ACCOUNT x

Superior know how

Categories

Pressure Washing Penstocks

A Unique Project/Challenge

The Snowy Hydro Project was a unique project for BlastOne. The Tumut-2 power station is a high-profile site hosting many press conferences throughout the year, including updates on the Snowy 2.0 project. It came to the attention of Snowy Management that the pipes were becoming a dirty eye-sore to this beautiful national landmark. So,  Snowy contacted BlastOne for some solutions to overcome this problem.

Snowy-Hydro-Penstocks

Snowy previously attempted the enormous task to clean the penstocks. But other robotic cleaning equipment proved to be insufficient and was unsuccessful. It was a massive cleaning challenge because the penstocks were nearly 6 meters in diameter, ran about 500 meters long down a steep slope, and there were 6 of them. The tops of the pipes were over 6 meters off the ground, covered in organic growth, making it terribly slippery and hazardous for personnel. Scaffolding would have been required and regularly repositioned to reach areas of the pipes.  It was also Alpine Park, so it was an environmentally sensitive area.

Penstocks before picture
Snowy Hydro After picture

M7 VertiDrive Cleaning Robot

Snowy got in contact with BlastOne for cleaning solutions. We hosted Snowy at a Demonstration Day at our BlastOne Adelaide facility. Where we showcased our recommended technology VertiDrive M7 Robotic cleaning system. This equipment was the ideal solution for the project due to its productivity through semi-automated remote controls. BlastOne’s mission is to keep the operator out of harm’s way, and the innovation of Robotic cleaning equipment allows us to do just that.

This was followed by live trials onsite with Snowy using the M7 to remove the organic growth from the external of the penstocks. The production rates achieved with the VertiDrive are superior to the current equipment being used. It would have taken about 4 or 5 personnel working by hand to keep up with one VertiDrive Robot.

We designed 2 customized VertiDrive Trailers to centralize them onsite and to aid in site mobility. The trailers were designed and developed by our fabrication team in Adelaide and driven 12 hours from Adelaide in South Australia to Snowy Hydro in New South Wales.

Snowy Hydro Consulting Picture
Snowy Hydro Consulting Picture

We had two VertiDrive Robotic Cleaning machines operating onsite. And they were achieving more than 1,000 square meters a day in production. We also had another VertiDrive on stand-by so that there wouldn’t be any downtime. Overall, more than 300 hours BlastOne resources ensured the water quality challenges and project deadlines were addressed.

Offering Technical Support contractors throughout our projects is part of our brand promise.  We have over 40 years of industry expertise, which we want to share with our customers to help them achieve success.

We’re happy to say, the contractor completed the project in line with their requested time frame and on budget.

Add to quote:

Registration is required to create a Quote.

Click Here to Login or Register.

Add to existing quote:

Add to Quote

Add to a new quote:

Send the request

BlastOne says
Thank you for submitting your quote. A sales representative will follow up with you asap.
Share Quote via Email

Share