FREE SHIPPING ON ORDERS OVER $100 x

Superior know how

Categories

US NAVY SURFACE PREPARATION CALCULATOR

Variable Costs Unit GMA GARNET CURRENT NUMBERS
A Abrasive consumption per hour: tonnes/hour
B Abrasive cost per tonne delivered: $ / tonne
X Square metres blast cleaned per hour: m²/hr
Abrasive consumption per m² kg/m²
Fixed Costs
C Clean up + Labor + Disposal Cost $ / tonne
D Labour cost per hour: $ / hr
E Equipment cost per hour: (compressed air, hoses, lenses, etc.) $ / hr
Z Total Square meters on Job
No: Of Blasters ea
No: of Formen + other personal ea
Disposal Cost
Disposal Cost / tonne $ / tonne
Tonnes of abrasive used tonnes
clean up tonnes/ hr per operator tonne/hour
Total labor + equipment / hr $ / hr
Total dumping cost $
Total Clean up + Disposal cost $
Set up, Breaks, Fill Labor Costs (non-productive time)
Total Hrs on site per day hr / day
Time not blasting or vacuuming / day hr / day
Blast Days on-site days
Total Non-Productive labor Cost $
Cost Per Hour To Blast per operator $ /hr
True Cost Per Finished Square Metre $ /hr
Total Non-Productive Time Cost
TOTAL JOB COST $
GMA Garnet CURRENT NUMBERS
Disposal
Equipment
Labor
Abrasives
Total
SpeedBlast Savings
80%

*based upon removing 250 microns epoxy coating, presenting a Class Sa2.5 surface with 65 microns of angular profile

Add to quote:

Registration is required to create a Quote.

Click Here to Login or Register.

Add to existing quote:

Add to Quote

Add to a new quote:

Send the request

BlastOne says
Thank you for submitting your quote. A sales representative will follow up with you asap.
Share Quote via Email

Share