FREE SHIPPING ON ORDERS OVER $100! | SEE IF YOU QUALIFY FOR A BLASTONE CREDIT ACCOUNT x

Home / Not 3 but 5 tanks blasted in 30 days

TANK BLASTERS DOUBLE PRODUCTIVITY

SPRING HILL, TENNESSEE, USA

BACKGROUND

Firstly, our client was tasked with blast cleaning three tanks. The tanks have a 15m (50 ft) diameter and 9m (30 ft) sidewall. Evidently, both the inner and outer surface areas needed to be cleaned, including the floor. Lastly, the project deadline is 30 days. This turnaround is challenging, even for an experienced blasting contractor.

Especially when the job site is within an electric car manufacturing environment that is extremely sensitive to dust and noise. Located near the main cooling towers, there were a total of eleven tanks. Significantly, any contamination of dust or debris in the water may cause plugging in the coils and affect the entire plant.

PROJECT OBJECTIVES

  • Increased production demand

  • Limited capacity

  • Increasing labor costs

SOLUTION

The contractor finished the job on time for two reasons. He used the most advanced wet blasting equipment supplied by BlastOne. Secondly, they switched to GMA ToughBlast™ garnet abrasive. Both were new to the contractor. He had never worked with the equipment, and being a slag user — he was hesitant to try an unfamiliar abrasive product.

The BlastOne technical team calculated the projected substantial cost savings from switching to GMA ToughBlast™. Due to the product’s high performance, the contractor would use less abrasive. Furthermore, garnet requires less cleanup with a lower volume of waste disposal. 

Even more, garnet also aligned with the site’s strict regulations. There was a zero-landfill policy. In addition, the BlastOne team conducted a blast cleaning demonstration for the contractor before delivering the equipment to the site.

RESULTS

Afterward, the contractor experienced increased demand. He worked on more tanks, but also catwalks, and other steel structures. Overall, this increase is due to GMA ToughBlast™’s low dust emission, leaving minimal residue on the ground. Moreover, the site management is pleased with the switch to an environmentally friendly mineral. Consequently, increasing the level of safety on site and in the environment.

Productivity-wise, the contractor specifically completed five tanks overall. One day ahead of their 30-day timeline. Therefore doubling the number of tanks they were originally planning to finish.

EXPERIENCE THE BENEFITS

GMA-Garnet-Zamac-Case-Study-Bar-Graph-Productivity-Icon

HIGH PRODUCTIVITY

Superior cleaning rate against other abrasives.

GMA-Garent-Zamac-Case-Study-Profits-Icon

COST EFFECTIVE

Lower garnet usage, labor, clean up and disposal cost.

GMA-Garnet-Zamac-Case-Study-Safety-Icon

SAFER TO USE

Meets industry, government and environmental safety standards.

CASE STUDIES

Spray Painting Booths

LIFT EQUIPMENT MANUFACTURER DOUBLES PRODUCTION RATE

gma garnet

HEBER WATER TREATMENT PLANT DOUBLES PRODUCTION RATE

Snakebite XQ saves Weir Minerals $500,000

CASE STUDIES HOME

Contact BlastOne

We love to talk to customers and help them make the best decisions when purchasing equipment.
You can reach us via our Live Chat, Email, Phone, and Online Form.

Add to quote:

Registration is required to create a Quote.

Click Here to Login or Register.

Add to existing quote:

Add to Quote

Add to a new quote:

Send the request

BlastOne says
Thank you for submitting your quote. A sales representative will follow up with you asap.
Share Quote via Email

Share